Two years of restoration-conservation work went into the building before any mechanicals or finished carpentry could be accomplished. Three-and-one-half dumpsters of trash, drop ceilings, temporary walls, etc. were removed. This did not include ancient plaster laths from the second floor and buckets and buckets of old plaster, linoleum and other cover-up flooring from the first floor. All of the knob and tube wiring, the old furnace, and the minimal plumbing had to be removed. BUT, there was no kitchen to remove because the building never had a kitchen!!! Since the original building dates from 1837, it had a summer kitchen at the rear. Also, a large brick wall at the rear of the property and a couple of lean-to type walls had to be removed from the premises. Volunteers from our community accomplished all the work. People who work as accountants, business owners, plumbers, County and City employees worked here on weekends.
The stabilization of the building came next. The rear brick wall had to be rebuilt. The original machine shop (now the Industrial Hall) had to be shored up through the center in order to handle the weight of the stoves. The cigar manufactory roof needed to be stabilized to handle the extra weight of the state of the art rubber roof. The staircase had to be rebuilt because half of it was removed in 1913. The original windows no longer existed so new windows had to be installed. Carpenter, Fred Engel, installed the staircase and the new windows. The rear brick wall was rebuilt by bricklayers Roger and Heath Wentz. The foundation parging had to be removed and secured. Brick mason, George Uhl, did that. Again, much of this work, such as the removal of the parging, was done with hours and hours of volunteer help. Volunteers installed the new floor in the Industrial Hall — the job took a complete summer!
The stabilization of the building came next. The rear brick wall had to be rebuilt. The original machine shop (now the Industrial Hall) had to be shored up through the center in order to handle the weight of the stoves. The cigar manufactory roof needed to be stabilized to handle the extra weight of the state of the art rubber roof. The staircase had to be rebuilt because half of it was removed in 1913. The original windows no longer existed so new windows had to be installed. Carpenter, Fred Engel, installed the staircase and the new windows. The rear brick wall was rebuilt by bricklayers Roger and Heath Wentz. The foundation parging had to be removed and secured. Brick mason, George Uhl, did that. Again, much of this work, such as the removal of the parging, was done with hours and hours of volunteer help. Volunteers installed the new floor in the Industrial Hall — the job took a complete summer!